Grants:Project/Kiwix/User Experience/milestones
Appearance
This is a rough calendar of deliverables, this is going to evolve depending of development speed.
January
[edit]- Administrative logistic
Done
- First release of zim-tools
Done
February
[edit]- Recruitment/HR
Done
- Fix ZIM format and libzim 4GB cluster limit
Done
- libzim and kiwixlib full support of iOS/macOS
Done
- Kiwix tools support of i586 architecture
Done
- Launch of a zimcheck tool
Done
March
[edit]- UI Concepts & first mockups
Done
- Implementation of new ZIM javascript API
Doing...
- Speed up zimwriterfs
Done
- Speed up attempts of libzim (reading)
Done
- Allow new ZIM file without namespace concept
Done
- Release of Kiwix Android 2.4
Done
Avril
[edit]- Write Kiwix lib documentation
Done
- Kiwix desktop code bootstrap
Done
- Kiwix desktop CI Linux
Done
- Kiwix desktop CI Windows
Done
- Kiwix desktop Dealing with ZIM files on the file system
Done
- Kiwix desktop 2.0 alpha for Windows/Linux
Done
- Kiwix for Android 3.0 (multizim support)
Doing...
May
[edit]Add support of ZIM extensions- Implementation of bookmarks (kiwixlib + UI)
Done
- Support of libaria2 (downloader) in Kiwix lib
Done
Kiwix for Android 3.1- Kiwix for macOS 2.0
Done
- Design of Kiwix-Desktop 2.0 (mockups)
Done
- Multi-arch compilation support in kiwix-build
Done
June
[edit]- Kiwix desktop 2.0
Doing...
- Implementation of content manager
Done
- Implementation of smaller features (print, search in page, zoom, ...)
Done
- Integration of localisation with Translatewiki
Done
July
[edit]Kiwix desktop 2.1Kiwix for Android 3.2